In connection with the implementation of the President’s instructions, the work carried out at JSC Shargunkumir in preparation for the autumn-winter season was inspected

In connection with the implementation of the President’s instructions, the work carried out at JSC Shargunkumir in preparation for the autumn-winter season was inspected

On October 4, 2024, the Transport Prosecutor’s Office inspected the work carried out at JSC Shargunkumir in connection with the fulfillment of the tasks set at the videoconference meeting dedicated to preparation for the current autumn-winter season chaired by President…